New septic systems for new builds and full replacements, designed for your lot and permitted through the county.

Building on a lot without sewer, or replacing a system that's beyond saving? A septic install done right lasts 25–40 years. Done wrong — undersized tank, field set too low for our water table — it fails in five. The difference is design and installation, not luck.
We evaluate your soil and water table, size the tank and field to your home's bedroom count and usage, pull the Osceola County permits, and install the complete system: tank, distribution, drain field and cleanouts. One contractor, one price, one point of responsibility — and a system built for Florida ground, not copied from somewhere else.
A new septic system usually comes up in one of three situations: a new home going up on a lot without sewer, an old system that has failed beyond repair, or a home adding bedrooms, which means the system has to be sized up to match. In all three cases the same rule applies. A septic install done right lasts twenty-five to forty years. Done wrong, with an undersized tank or a field set too low for the water table, it fails in five. The difference is design and installation, not luck, and it is decided before the first shovel hits the ground.
Every install starts with the lot itself. We evaluate the soil to see how well it treats and drains effluent, measure the water table, including the seasonal high that matters in Florida, and check setbacks from wells, lakes, property lines and the house. That evaluation decides whether the lot takes a conventional system or needs a mound system lifted above the groundwater, and it sets the size of the tank and field for the home's bedroom count and real water use. A system copied from a different lot in a different county is how installs go wrong.
From there the process is straightforward and handled for you. We design the complete system, tank, distribution and drain field with cleanouts, prepare and file the permit with the Florida Department of Health in Osceola County, and install the whole thing once the permit is approved. One contractor, one price, one point of responsibility, and a final inspection before the system goes into service. You also get as-built documentation for your records, which is the paperwork a future buyer or inspector will ask for.
The long life of a new system depends on what happens after we leave. Pump it every three to five years, keep heavy water use spread through the week, keep vehicles and deep-rooted trees off the drain field, and fix leaking fixtures, because a running toilet can flood a field with hundreds of gallons a day. Do those few things and the system should outlast the roof. Ignore them and even a perfectly installed system will fail early, which is why every install ends with us walking you through the maintenance schedule in plain terms.
If you are comparing installers, ask each one the same questions: how did you size the tank and field for this lot, what did the soil and water table evaluation show, and what is included in the price. A quote that skips the site evaluation is not a quote, it is a guess, and the cheapest guess usually becomes the most expensive system once the county inspector gets involved. Our site evaluation and quote are free and exact, and the price you approve covers design, permits and installation, not just the digging.
Most complete residential installs in Osceola County run $8,000–$20,000 depending on tank size, field type and site conditions. Your site evaluation and quote are free and exact.
Yes — septic systems in Florida are permitted through the Department of Health in Osceola County. We prepare and file everything as part of the job.
Tell us what you need and a local pro will call you back with an exact price. No obligation, no pressure.